{"id":2817,"date":"2024-08-25T13:12:06","date_gmt":"2024-08-25T13:12:06","guid":{"rendered":"https:\/\/workhouse.sweetdishy.com\/?p=2817"},"modified":"2024-08-25T13:12:06","modified_gmt":"2024-08-25T13:12:06","slug":"interconnection-of-three-phases","status":"publish","type":"post","link":"https:\/\/workhouse.sweetdishy.com\/index.php\/2024\/08\/25\/interconnection-of-three-phases\/","title":{"rendered":"INTERCONNECTION OF THREE PHASES"},"content":{"rendered":"\n<p id=\"para-021\">In a three-phase AC generator, three are three windings. Each winding has two terminals (start and finish). If a separate load is connected across each phase winding as shown in\u00a0Figure 8.3, then each phase supplies an independent load through a pair of leads (wires). Thus, six wires will be required in this case to connect the load to generator. This will make the whole system complicated and expensive.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/learning.oreilly.com\/api\/v2\/epubs\/urn:orm:book:9789332558311\/files\/images\/page388_1.png\" alt=\"image\"\/><\/figure>\n\n\n\n<p id=\"para-022\"><strong>Fig. 8.3<\/strong>&nbsp;&nbsp;Three-phases supplying power independently<\/p>\n\n\n\n<p id=\"para-023\">In order to reduce the number of the conductors, the three-phase windings of the AC generator are suitably interconnected. The following are the two universally adopted methods of interconnecting the three phases:<\/p>\n\n\n\n<ol class=\"wp-block-list\" id=\"ol-007\">\n<li>Star or wye (Y) connection<\/li>\n\n\n\n<li>Mesh or delta (\u2206)<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>In a three-phase AC generator, three are three windings. Each winding has two terminals (start and finish). If a separate load is connected across each phase winding as shown in\u00a0Figure 8.3, then each phase supplies an independent load through a pair of leads (wires). Thus, six wires will be required in this case to connect [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2818,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[411],"tags":[],"class_list":["post-2817","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-three-phase-ac-circuits"],"jetpack_featured_media_url":"https:\/\/workhouse.sweetdishy.com\/wp-content\/uploads\/2024\/08\/page388_1.png","_links":{"self":[{"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/posts\/2817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/comments?post=2817"}],"version-history":[{"count":1,"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/posts\/2817\/revisions"}],"predecessor-version":[{"id":2819,"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/posts\/2817\/revisions\/2819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/media\/2818"}],"wp:attachment":[{"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/media?parent=2817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/categories?post=2817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/workhouse.sweetdishy.com\/index.php\/wp-json\/wp\/v2\/tags?post=2817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}